第六章 项目进度管理 Chapter 6 Project Schedule Management

6.0 Processes 6个过程

6.1 Plan Schedule Mgmt.(P) - Documenting how the schedule will be developed and controlled.

6.1 规划进度管理 - 文档记录如何制定进度和控制进度。

6.2 Define Activities(P) - Identifying the steps required to produce project deliverables.

6.2 定义活动 - 识别产出项目所需可交付成果的具体活动。

6.3 Sequence Activities(P) - Identifying relationships(or order) of project activities.

6.3 排列活动顺序 - 识别项目活动之间的关系和顺序

6.4 Estimate Activity Durations(P) - Approximating the number of work periods to complete activities.

6.4 估算活动持续时间 - 估算完成每个活动的工作时间。

6.5 Develop Schedule(P) - Analyzing activities sequences and estimates to create the schedule.

6.5 制定进度计划 - 分析活动顺序并制定进度表。

6.6 Control Schedule(M) - Monitoring activity progress; managing changes to the schedule baseline.

6.6 控制进度 - 控制项目进度安排;管理进度基准的变更。

"Define Activities" - Key Outputs 6.2 定义活动 主要输出

Activity List - A list of activities with identifiers and scope; in agile, this is updated periodically.

活动清单 - 带有标识符和工作范围的一系列活动列表;在敏捷项目中,本清单周期性更新。

Activity Attributes - More info about activities(e.g. identifiers, predecessors, leads/lags, etc.).

活动属性 - 各个活动的更详细说明(比如:标识符,紧前活动,提前量/滞后量等)。

Milestone List - A list of major points in the project; indicates whether they are mandatory/optional.

里程碑清单 - 项目中的一系列关键点的列表;说明他们是否是强制或可选的。

"Sequence Activities" - Key Concepts 6.3 排列活动顺序 核心概念

Sequence Activities - Documenting activity relationships.(Not everything can be at the same time!)

排列活动顺序 - 文档记录活动之间的关系(不是所有活动都可以同步进行)。

"Sequence Activities" - Key Tools 6.3 排列活动顺序 主要工具

Dependency Determination & Integration 确定和整合依赖关系

Precedence Diagramming Method(PDM) 紧前关系绘图法

Leads & Lags 提前量 & 滞后量

"Develop Schedule" - Key Tools 6.5 制定进度计划 主要工具

Schedule Network Analysis - Identifying early and late start/finish dates.

进度网络分析 - 识别开始/完成的最早、最晚时间点。

Critical Path Method - Estimating minium project duration and amount of scheduling flexibility.

关键路径法 - 估算最短项目工期和进度计划的浮动空间。

Resource Optimization - Adjusting activities so resources are appropriately allocated.

资源优化 - 调整活动,让资源能合理分配。(资源平衡、资源平滑)

Schedule Compression - Shortening schedule without reducing scope.

进度压缩 - 不减少范围的情况下缩短项目进度。(快速跟进、赶工)

Agile Release Planning - A timeline of the release schedule based on the product roadmap/vision.

敏捷发布规划 - 基于项目路线图/产品发展愿景的发布进度时间线。

"Develop Schedule" - Key Outputs 6.5 制定进度计划 主要输出

Schedule Baseline - Approved version of the schedule; under change control; compared to actuals.

进度基准 - 经过批准的进度模型。

Project Shcedule - Includes linked activities with planned dates, durations, milestones, resources.

项目进度计划 - 包含一系列带有计划日期、工期 、里程碑和资源信息的项目活动。

Schedule Data - Supporting detail for the schedule(e.g. alternative schedule, cash-flow projections).

进度数据 - 项目进度计划的详细信息(比如:现金流量预测表,替代进度方案等)。

Project Calendars - Identifies the project's working days and shifts.

项目日历 - 识别项目中的工作日和休息日。

"Estimate Activity Durations" - Estimating Techniques 6.4 估算活动持续时间 估算技术

Bottom-Up Estimating - Aggregating estimates of lower-level components of the WBS.

自下而上估算 - 从下到上逐层汇总WBS组成部分的估算。

Analogous Estimating - Using historical data from a similar project or activity.

类比估算 - 使用相似项目或活动的历史数据来进行估算的方法。

Parametric Estimating - Using an algorithm built on historical data to generate an estimate.

参数估算 - 基于历史数据,使用某种算法来计算。

Three-Point Estimating - Averaging optimistic, pessimistic, and most likely estimates.

三点估算 - 将最乐观、最悲观和最可能时间进行平均计算。(三角分布、贝塔分布)

"Estimate Activity Durations" - Key Outputs 6.4 估算活动持续时间 主要输出

Duration Estimates - Estimated number of time periods to complete the work.

持续时间估算 - 估算完成工作的时间量。

Basis of Estimates - Details supporting the duration estimate.(e.g. method, assumptions, etc.)

估算依据 - 持续时间估算的详细依据(比如:估算方法,假设条件等)。