MODULE 2: UPPER CONSOLE-5

2020-02-10  本文已影响0人  hi武林高手

Enabling Objective #5
Removal/Intstall of LCD Monitor,WIRE Feed/BITS board ,EFo Box assembly
Replacement of LCD Monitor



Wire Feed/BITS Board Location



Wire Feed/BITS Board Removal

-Remove top panel cover screws(9x)
-Disconnect all electrical cables from wire Feed/BITS Board

-Remove top panel cover screws(9x)(Loose phiip screw, slide board to right to remove)
-Disconnect all electrical cables from Wire Feed/BITS Borad
-Locate and loose 1 screw that secures the board to the upper console base

-Slide board to right and pullit away from the standoffs Wire Feed/BITS cable connections
EFO Box Assembly
-Up To 5000 VOLTS DC IS PRESENT WITHIN THE EFO BOX WHEN THE EFO FIRES
-DO NOT OPEN THE EFO BOX
-THERE ARE NO USER-SERVICEABLE COMPONENTS INSIDE THE EFO BOX

EFO BOX REMOVAL

Procedure:
上一篇 下一篇

猜你喜欢

热点阅读