来源1:Systems Engineering Tools and Methods

Ali K. Kamrani Maryam Azimi

网址

Figure 3.7 shows the funcrion of a context diagram, here called an activicy unir, surrounded by orientation-specified inputs, outputs, controls, and enablers. Note that an activity unir can encompass and subsume a complete process.```

##### 来源2 INCOSE SEHB

This version of the handbook provides a high level view of the process‐of‐interest. 

The diagram summarizes the process activities and their inputs and outputs from/to external actors; some inputs are categorized as controls and enablers. 

- A control governs the accomplishments of the process; 

- an enabler is the means by which the process is performed.